New Entry in Pickling line Design, supply transport, electrical equipment, programming, erection and erection supervision and commissioning of new equipment for entry pickling line in LUSOSIDER - Portugal (CSN GROUP). TPI has accomplished the invest of new entry in pickling line in LUSOSIDER - Portugal (CSN GROUP), including New threading [...]

Belt wrapper galvanizing line
admin 2021-05-28T11:10:31+00:00Belt wrapper galvanizing line Design, supply transport and erection supervision and commissioning of new belt wrapper for galvanizing line LIBERTY GALATI (Romania). The order for this supply was received in the middle of the lockdown due to COVID-19 pandemic. Duet to this reason it was not able to visit during [...]
New recoiler mandrel for slitting line
admin 2019-11-21T10:16:28+00:00New recoiler mandrel for slitting line Supply of new recoiler mandrel with new rotary joint and expansion cylinder and new gear wheel for slitting line in Acerinox. The Solution The supplied mandrel is designed for high tension strength strip with a system of [...]
New Bridle Picking line Nº3
admin 2019-11-21T10:42:57+00:00New Bridle Picking line Nº3 Supply of new complete bridle and motorization (Frames, cardans shafts, reducers, couplings……..).including maintenance and access structure and erection and commissioning on site in ARCELORMITTAL GENT Belgium. The Solution The supply of the new bridle improved the [...]

Notcher in inspection and recovery line
admin 2019-11-21T10:18:28+00:00Notcher in inspection and recovery line Design, supply and setting up of a new notcher for side trimmer, permitting the supply in its own unit, as well as an associated hydraulic table and electrical unit. The Solution TPI supplied [...]

Equipment for automatic evacuation of sleeves
admin 2019-11-21T10:18:53+00:00Equipment for automatic evacuation of tubes Design, supply and setting up of a system of automatic evacuation of sleeves in the temper line located in ARCELORMITTAL Consists of a roboticised arm installed in a commercial crane adapted for this purpose and involving a hydraulic group of 1,000 litres. The supply [...]

Withdraw of EMAS equipment out of line (magnetic stabilizer)
admin 2018-01-19T11:23:48+00:00Withdraw of EMAS equipment out of line (magnetic stabilizer) This equipment has been awarded a European prize, as part of ARCELORMITTAL, for improvements in safety TPI designed, supplied and set up this autonomous equipment which carries out automatically both the extraction and the introduction on line of the magnetic stabilizing [...]
Inspection and coil recovery line
admin 2019-11-21T10:20:15+00:00Inspection and coil recovery line Inspection of coils in a process line (temper Line) in a plant of ARCELORMITTAL. TPI supplied a complete new line of inspection and cleaning, and took advantage of a transversal cutter that the client had in another plant and was not using. The line is [...]

Equipment for the prevention of telescopicity in coils (COILFORM)
admin 2018-01-17T13:22:01+00:00Equipment for the prevention of telescopicity in coils (COILFORM) Installed in two lines of ARCELORMITTAL, a temper line and an inspection line for galvanized and temper. TPI have created a piece of equipment (COILFORM) to eliminate telescopicity in the coils that already have this defect and are already strapped, without [...]

Magnetic threading table inspection line
admin 2018-01-18T12:57:46+00:00Magnetic threading table inspection line Design, supply and set up of new magnetic threading table in order to allow easier threading of the coils in the inspection line, including the supply of new hydraulic block and associated electrical equipment. It was installed to replace a (non- magnetic) threading table, having [...]