Project Description
Equipment for automatic evacuation of tubes
Design, supply and setting up of a system of automatic evacuation of sleeves in the temper line located in ARCELORMITTAL
Consists of a roboticised arm installed in a commercial crane adapted for this purpose and involving a hydraulic group of 1,000 litres. The supply is based on a main unit for evacuation of tubes and an auxiliary unit (commercial crane with a magnetic raising and lowering system).