Project Description
Bypass of inspection levelling tension line
The design, supply and set up of an inspection line bypass and levelling under tension in order to be able to do “coil to coil” processing without having to thread the coil in the bosses.
To do this, two new pulling units and deflectors were fitted as well as the corresponding step tables and a new magnetic threading table to facilitate threading the coil.

